How to Successfully Handle Large-Diameter PDH Pipeline Prefabrication
With large-diameter piping, the fabrication rules undergo a dramatic change. What appears as an entirely doable spool in the working drawing might be impossible to handle in actual practice due to its tremendous diameter when it comes to fabrication, alignment, welding, handling, transportation, and installation.
This is best illustrated in PDH projects by propane. The piping is process and normally includes large sizes, tight installation interfaces, the welding requirements are quite demanding and site logistics can be very complex. At FEITING, we regularly carry out PDH pipeline prefabrication, including the largest PDH project with a maximum pipe diameter of DN2200. Such work shows that at every phase, large-diameter prefabrication must be subjected to stricter control
Reasons That Complicating Large-Diameter PDH Pipe
The primary difficulty in the large-diameter PDH pipeline prefabrication is a mere fabrication of a large pipe but a problem of the spool being kept within dimensional allowances from fabrication until its delivery.
A small error may cause a noticeable dismatch if the diameter of the pipe is big. For example, the face of a flange can be turned away, the line of an pipe shifted, or spool geometry altered by welding.
As a part of the process, engineers must consider fit-up control through the choice of the sequence of welding, points of support, methods of lifting, and inspection on site as one interconnected task for the PDH pipeline prefabrication for large diameter piping
FEITING has worked on DN2200 project which is a great example of a practical guide for a level of scale where a work is fabricated.
Fit-Up Demands Accuracy Beyond Good Cutting
Cutting initiates the dimensional work process.
For large-diameter PDH pipeline prefabrication, it was important for the techniciens that before even fit-up was undertaken cutting dimensions, bevels, ovality, center lines, and references were checked.
When fitting is done, workers shall check root gaps, branch orientation, flange position and so on and shall make sure that the alignment is right.
It should also not forget to use temporary supports when required if the components are very big, to avoid any accidental movement.
A good fit-up minimizes the chances a spool needs to be forced to get connected during installation. Therefore, it can be safely said that fit-up accuracy plays a very important role in preventing unexpected work in field for PDH pipeline prefabrication for large diameter piping
Welding Changes Spool Geometry
The greater the diameter of the pipe, the more the length of welding that can be done. In addition to that there may also be shrinkage and warping after welding due to heat.
In fact distortion can be minimized significantly if there is an appropriate welding sequence to spread the thermal stress.
In regard to large-diameter PDH pipeline prefabrication such as the DN2200, the measurements may vary from the initial ones, hence instead of relying on measurements made during fabrication the spooled geometry should be considered as an important parameter at the end.
For PDH pipeline prefabrication for large diameter piping, however welding is completed, an inspection of flange orientation and the like in particular become very vital
Flange Alignment Is the Key to Site Installation
The pipe spool which is of larger size could be equipped with several flanges, fittings, branching pipes, and so on. The shifting or rotation of even one flange from its originally intended position could result in the misalignment of the entire set of the installation.
At large-diameter PDH pipeline prefabrication, the workers should, in addition to the flange face orientation, the alignment of bolt holes, elevation of the pipe centerline, the distance between the two points of the connection to the spool also check the alignment of connection points.
Naturally, the goal is not the hardest one: The spool has to remain intact and the connection workable on site.
This simple principle is extremely important where PDH pipeline prefabrication for large diameter piping is in consideration, because if a massive spool at the job site is moved or reworked then heavy human power and huge lifting equipment are required.
Control Spool Deformation from the Beginning
Spool deformation in different phases can be due to welding, lifting, temporary storage, transport, and unloading.
For a heavy-lIFTED spool the workers have to support it at right places otherwise the shape of a large spool can be changed. Besides, an improper lifting causes the spool to bend as the force of bending was missing at the time of fabrication.
What the DN2200 large-diameter PDH pipeline prefabrication project at FEITING is a typical example of why lifting plans for a pipe spool should be done in the fabrication phase, not left to transportation.
With PDH pipeline prefabrication for large diameter piping, in order to prevent deformation of the spool the workshop personnel have to determine and mark appropriate lifting points and support locations even before the spool is ready to be taken outside the workshop.
Transportation is the Part of Engineering Job
A well-made spool could still fail if its transportation results in geometrical deformation or it could not safely be delivered.
Besides large-diameter PDH pipeline prefabrication also needs to be carefully designed regarding the overall dimension, loading operation, route limitations, lifting capacity, and the temporary protection.
The group of fabricators should be thoroughly aware of the transportation limitations before fixing the spool dimensions. Through this method of working they could avoid the situation that the workshop-fitted spool could become the problem during loading or even onsite handling.
Site Interfaces Must Be Strictly Supervised
Actually, the ultimate test of the large-diameter PDH pipeline prefabrication\u2018 work is done on the site.
Workers on site expect all flanges and fittings on a spool to match those on the latest piping isometrics drawings.
There will be a variety of issues that will affect the outcome in the site such as; equipment nozzles, adjacent spool, buildings and pipe supports.
For PDH pipeline prefabrication for large diameter piping, it should be the manufacturers\u2019 role to always be in a clear reference dimension, a system that gives a reference point to identify dimensions and marking to follow the spool from the beginning of the fabrication and then on site.
This consistent method to identify a spool also helps the installers to quickly find the part that is required of them.
FEITING can integrate manufacturing of pipes, fittings, and flanges along with prefabrication, which will allow customers to have a much greater understanding of and ability to control, a network of pipe components.
What Should the Engineers Check?
Before the production starts, project teams should make sure of the following:
Pipe diameter and wall thickness
Material specification
Isometric drawing revision
Flange type and orientation
Location of branches and fittings
Welding requirements
Dimensional tolerances
Lifting points
Transportation restrictions
Connection dimensions at the site
As the pipe diameter increases these details become significantly relevant for production. Engineers who design pipelines should be aware that there will be many factors which will come into play that can impact both the design and fabrication of a pipeline and its ultimate function on the ground
Summary
In addition to having a large fabrication facility, large-diameter PDH piping can be handled well only if dimensional tolerances are maintained tightly and engineering, fit-up, welding, inspection, logistics and site installation, among others, are all coordinated well.
FEITING has done PDH pipeline prefabrication of projects involving a maximal pipe diameter up to DN2200, which gives practical insights with respect to large spool, alignment, welding, dimensional control, and delivery.
The ultimate goal of large-diameter PDH pipeline prefabrication is indeed not just to create a massive size spool. It is to deliver the spool which maintains the geometry from the workshop to the point of final connection.