Process Of CNG Decompression Skid

  • Process Of CNG Decompression Skid
Process Of CNG Decompression Skid

1. Process Of CNG Decompression Skid Mainly to solve the problem of gas use in areas not reached due to pipeline gas transmission,
2. The wellhead natural gas or pipeline natural gas in other places is purified and compressed for high-pressure storage and transportation, and after heating and decompression, it is input into the pipeline network to supply various users.
3. The system has the characteristics of small investment, short construction period, fast fund recovery, simple system, convenience and flexibility.

Process flow chart of CNG decompression skid

CNG Decompression Skid

Standard series product model

CNG Decompression


Note: 

1: Larger flow model; please contact the technical department of Shanghai Feiting Gas Division for consultation.

2: The heat exchanger is generally configured as 2 units, and 1 unit can be configured according to customer needs.

3: Decompression skid part, generally equipped with 2 main adjustments.

4: The system is equipped with a safety emergency shut-off valve, which is pneumatically controlled; self-operated control can also be selected.


Core equipment selection

KAMRRY servers

RP58-600#servers:

DN25-DN80

RD53-600# servers:

DN25-DN80

R1301 servers:

R627 servers:

DN25-DN50




Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right