Get the latest price? We will reply as soon as possible (within 12 hours)

FEITING Group Delivers Lummus PDH Pipe Prefabrication for Ningbo Haiyue Project

2025-06-12

Precision Prefabrication Supports Cutting-Edge CATOFIN Dehydrogenation Technology

Project Background

FEITING Group proudly announces its successful delivery of Lummus PDH Pipe Prefabrication solutions for the Ningbo Haiyue Propane and C4 Utilization of Propane Dehydrogenation Project. This strategic project, developed by Ningbo Haiyue New Material Co., Ltd. and designed by Sinopec Ningbo Engineering Company, employs advanced CATOFIN technology to convert propane into propylene with outstanding efficiency.

About CATOFIN PDH Technology

The CATOFIN process is a fixed-bed dehydrogenation technology used worldwide to produce high-purity propylene from propane. Its core advantage lies in its reliable performance, low energy consumption, and high selectivity. Operating under optimal temperature and pressure conditions, CATOFIN reactors deliver superior conversion rates and high propylene yields—making it a favored option for PDH (Propane Dehydrogenation) projects globally.

FEITING Group’s Lummus PDH Pipe Prefabrication services were developed in full compliance with the design demands of the CATOFIN process, ensuring temperature resilience, pressure integrity, and operational reliability.

Prefabrication Details

In this project, FEITING Group delivered one set of high-quality prefabricated components for a waste heat utilization mixer, a critical unit designed to optimize energy efficiency by capturing and redirecting thermal energy within the PDH process.

  • Customer: Ningbo Haiyue New Material Co., Ltd.

  • Design Institute: Sinopec Ningbo Engineering Company

  • Project Name: Propane and C4 Utilization of Propane Dehydrogenation Project

  • Product: Waste Heat Utilization Mixer

  • Specification: DN2200

  • Material: WP321H, F321H, WP11

  • Number of Prefabricated Parts: 1 set

  • Total Components Delivered: 78 parts including tees, flanges, and heads

Each prefabricated component was precision-engineered and fabricated to meet strict tolerance and quality standards, ensuring flawless integration on site.

Core Advantages of FEITING's Lummus PDH Pipe Prefabrication

FEITING Group’s Lummus PDH Pipe Prefabrication approach is built on a foundation of engineering rigor, industrial insight, and a commitment to client success. Our prefabrication services offer a range of benefits that are particularly vital for high-performance PDH systems:

  1. High Precision Fabrication: Our advanced CNC and robotic welding facilities ensure unmatched dimensional accuracy and weld quality.

  2. Material Excellence: Using corrosion-resistant and high-temperature alloys such as WP321H and WP11 ensures long-term durability in severe operating environments.

  3. Reduced On-Site Labor: Our pre-tested, pre-assembled modules minimize installation complexity and field welding, which accelerates project timelines.

  4. Energy Efficiency: Waste heat recovery components are designed to enhance energy utilization across the PDH system, aligning with green engineering principles.

  5. Compliance with International Codes: All prefabrication follows ASME, ISO, and customer-specific standards to meet safety and reliability benchmarks.

Design Collaboration and Execution

Working closely with Sinopec Ningbo Engineering Company, FEITING’s technical team ensured that all Lummus PDH Pipe Prefabrication drawings and material specifications were fully aligned with CATOFIN process requirements. The large diameter (DN2200) of the system introduced engineering challenges, especially in ensuring weld integrity and thermal expansion control, which were successfully overcome through detailed FEA simulations and stringent QC protocols.

Sustainability and Innovation

Our prefabricated piping systems integrate sustainability at every stage—from design to delivery. The waste heat mixer unit itself reflects an energy-conscious philosophy, reusing excess heat to reduce fuel consumption and carbon emissions. FEITING Group also implements green manufacturing practices, such as low-waste cutting, recycling of metal offcuts, and solvent-free coatings.

Customer Satisfaction

The prefabricated piping set has been fully delivered to the Ningbo Haiyue construction site and successfully passed dimensional checks and pressure testing. The client has recognized FEITING Group for its fast response, engineering support, and outstanding execution throughout the project lifecycle.

Conclusion

FEITING Group’s expertise in Lummus PDH Pipe Prefabrication continues to support next-generation petrochemical projects across China and beyond. By combining material innovation, detailed engineering, and digital fabrication, we empower our clients to meet performance goals with reduced costs and enhanced safety.

To learn more about our Lummus PDH Pipe Prefabrication capabilities, or to discuss your upcoming project requirements, please contact the FEITING engineering team today.

Address

Office: 12F O-PARK, Huishan District,Wuxi, China

Wuxi Plant: No.1 chengxigiao Road, Jiangyin city, Wuxi, China

Shanghai Plant:  No.85 Shande Road, Jinshandistrict Shanghai